SignalLine AI
Guide · Housing · 6 min read

TSM sample shortfall and top-up fieldwork

What the accuracy bands actually bind on, how to tell in January whether you will land short, and what it takes to close the gap before 31 March.

By Dmitri Dolgorukov, Electrical Design Engineer

Published

If you’re reading this in January with a completes count that doesn’t look like it’s going to get you to your required sample by 31 March, you’re in the position a large share of your peers are in every year — and almost all of them finish in band. What separates a routine top-up wave from a March scramble is whether you do the arithmetic now.

What the accuracy bands actually require

The Regulator of Social Housing doesn’t set a minimum response rate for tenant perception TSMs. It sets a required margin of error at 95% confidence, banded by the size of your stock, and it’s your job to hit it with an achieved sample:

Stock sizeRequired margin of error
Under 2,500 units±5%
2,500–9,999 units±4%
10,000–24,999 units±3%
25,000+ units±2%

LCRA (social rent) and LCHO (shared ownership) are assessed separately against these bands if you hold both tenures. There’s no rule that says you need a 30% response rate, or any particular number of invitations sent — only that your achieved sample, run through the standard sample-size formula for your population, lands inside the band. A smaller landlord with a lower response rate can be perfectly compliant; a larger one with a higher response rate can still fall short, if the achieved sample doesn’t clear the number the maths requires.

That number, for a given stock size, is:

LCRA unitsRequired marginRequired completed responses
1,500±5%306
3,000±4%501
6,000±4%546
8,500±4%561
10,000±3%965
12,000±3%981

These are the standard finite-population-corrected sample sizes at z = 1.96, p = 0.5 — the same maths behind our TSM sample-size calculator. Run your own stock count through it rather than reading these off a table; the required sample doesn’t scale linearly, and the jump at each band boundary is real (an 8,500-unit landlord and a 10,001-unit landlord need very different sample sizes, not a smooth curve).

How to tell in January whether you’re going to land short

The survey year runs 1 April to 31 March, and large landlords submit by 30 June — so by January you have roughly two months of fieldwork left before the numbers need to be final. The check is arithmetic, not guesswork:

  1. Take your required sample for your stock size and tenure (the table above, or the calculator).
  2. Take your completes-to-date.
  3. Divide the gap by your average weekly completion rate over the last full month of fieldwork, not the whole year — response rates aren’t flat across a fieldwork programme, and your most recent weeks are the better predictor of what’s left.
Worked example.A landlord with 6,000 LCRA units needs 546 completed responses at ±4%. By the end of January they’ve banked 380. That’s a shortfall of 166 — not a crisis, but not something that closes itself on the fieldwork pace that got them to 380 over nine months, either. The question worth asking in January is whether the last quarter of business-as-usual fieldwork will close 166 completes, or whether it needs a dedicated push.

What a top-up wave actually involves

A top-up wave is exactly what it sounds like: additional dedicated fieldwork against the same tenant population, run separately from — and after — the main survey, sized to close a known gap rather than to hit a headline target from scratch. It only works if you know the gap precisely, which is why the January check above matters more than a vague sense of being “behind.”

Telephone fieldwork is the fastest way to close a late gap because it doesn’t depend on postal turnaround or online response drift — a telephone team working a defined tenant list can typically complete a 200-response wave inside 2–3 weeks, which still lands inside the 31 March fieldwork cut-off if you start the check in January rather than March. Perception fieldwork has to be carried out within the reporting year, so the 30 June submission deadline is not extra fieldwork time. That timing is the entire point of running the January check: a gap caught with two months of runway is a top-up wave; a gap caught with two weeks of runway is a scramble.

On cost: a full perception survey is priced per completed response, with a 250-complete minimum. A smaller, fixed top-up wave of 200 completed responses is £800 — the same per-complete rate as the standard survey, packaged as a dedicated wave rather than folded into a fresh minimum-size commission. For the worked example above — a 166-complete shortfall — one 200-complete top-up wave covers it with room to spare. You can size a wave to your own gap using the TSM sample-size calculator, which shows the achieved-sample maths and an indicative cost for your own stock count.

Being close to the line is normal, not a failure

It’s worth saying plainly, because the alternative reading is unfair to a lot of teams doing this properly: finishing close to your required sample is standard practice across the sector, not a sign that something has gone wrong.

Across the 152 landlords with 1,000–10,000 LCRA (social-rented) tenants who run their TSM survey predominantly by telephone — the segment most comparable to a landlord reading this — 53 finished 2024/25 within 10% of their required sample, and 29 within 5%. That’s roughly a third of the group within 10%, and about one in five within 5% — landing near the line is a common outcome, not an outlier. And the bands themselves are rarely missed: only 2 of 353 large landlords nationally exceeded their required margin of error in 2024/25. The sector, on the whole, gets there. The published data records achieved samples, not how landlords got them — but a deliberate, correctly sized top-up wave is a more reliable route to that outcome than hoping the last quarter’s fieldwork pace is enough.

If your January numbers put you in the same position as most of your peers, the answer isn’t to panic about the trend — it’s to run the arithmetic, size the gap, and decide early enough that a top-up wave is a normal scheduling decision rather than a March fire drill.

Sources

About SignalLine

A top-up wave, sized to your gap, inside the reporting year.

SignalLine AI runs TSM perception fieldwork by telephone at a pace that closes a late gap in weeks, not months — verbatim TP01–TP12 wording, 15 languages, and a transcript behind every completed response. Tell us your required sample and your completes to date, and we’ll size the wave.

Call Thalia · +44 20 4511 4077